Wednesday, 24 April 2024

 

 

LATEST NEWS When the Congress government came, 50% reservation to women and MSP to farmers : Anuma Acharya AAP’s hard hitting attack on Channi: Post 1st June you will be arrested Manish Tiwari will win by a Huge margin: Jarnail Singh Amman is back with Romantic Track 'Dil Kare' Congress is working to divide the country in the name of religion and caste: Dr. Subhash Sharma PM Modi synonymous with trust, hope, credibility: Devender Singh Rana Atal Dulloo reviews the working & Public Outreach activities of Information Department General, Police Observer interact with Zonal, Sectoral Magistrates, BLOs of district Reasi Div Com Jammu, ADGP visit Rajouri, review preparations for elections Lt Governor addresses seminar on National Education Policy 2020 at Ghazipur DC Bandipora Shakeel ul Rehman Rather reviews Floriculture, Fisheries, Sericulture Departments DC Bandipora Shakeel ul Rehman Rather reviews performance of AHD DC Bandipora Shakeel ul Rehman Rather reviews Agriculture Sector DEO Bandipora Shakeel ul Rehman Rather inspects EVM, material strong room DEO Bandipora Shakeel ul Rehman Rather reviews poll preparedness Harnit Singh Sudan (IAS 2023) Interacts with IAS/JKAS Aspirants Marathon under SVEEP held at Samba to maximize voter awareness DEO Kupwara reviews transportation of polling staff, EVMs DEO Kulgam flags-off cycle rally under SVEEP to raise voter awareness 5 more candidates file nominations for Srinagar Lok Sabha seat TV Serial Actor Abhinav Shukla Net Worth 2024 | 5 Dariya News

 

River Jhelum Flood Protection Works : Sham Lal Choudhary reviews progress on DPR formulation

Directs for submission of detailed case study in 20 days

Listen to this article

Rouf Pampori

Rouf Pampori

5 Dariya News

Jammu , 02 Apr 2018

Minister for PHE, Irrigation and Flood Control Sham Lal Choudhary today chaired a meeting to discuss the finalization of DPR for Phase-II of ‘comprehensive flood management plan works on river Jhelum and its tributaries’.Secretary, PHE, I&FC Department M Raju, Chief Engineer, I&FC Jammu K K Mangotra, Chief Engineer, I&FC Kashmir M.M Shahnawaz, Chief Engineer, IBO CWC Chandigarh Atul Jain, Director, M&A CWC Jammu Kamlesh Jain and other senior officers of the department were present in the meeting.During the meeting, in depth discussions were held on all components of the flood management plan so as to mitigate the dangers that may arise due to rise in the level of water in Jhelum.The comprehensive flood management plan works on river Jhelum and its tributaries is being executed under the Prime Minister’s Development Plan which includes works pertaining to flood protection, anti-erosion, widening of river, raising of embankments, re-sectioning, desilting and dredging of the river. It includes various immediate, short term and long-term measures to reduce the risk of floods in the river.For Phase-II of the project, Rs. 1684.60 crore have been approved under PMDP which includes central assistance of Rs. 1179.22 crore and state share of Rs. 505.38 crore.Regarding the progress on formulation of DPR, the Minister was informed that mathematical model study of the river was done by CWPRS, Pune. A team of CWC officers also conducted site visits of the river and recommended that the flood discharge carrying capacity of the river Jhelum should be improved to 60,000 cusecs from Sangam to Padshahibagh, it was informed.Taking note of various pertinent points raised in the meeting, the Minister directed the officers to submit the detailed case study within 20 days so that DPR for Phase-II can be prepared and work be started this year.

 

Tags: Sham Lal Chowdhery

 

 

related news

 

 

 

Photo Gallery

 

 

Video Gallery

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2024 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD