Thursday, 09 May 2024

 

 

LATEST NEWS Bhagwant Mann campaigned for Dr. Balbir Singh in Patiala Mann campaigned for Meet Hayer in Malerkotla AAP gives a jolt to Akali Dal in Amritsar Bolaria said South Constituency is ready for hat-trick Believe in politics of issues Sukhpal Singh Khaira And Dr. Dharamvir Gandhi File Nomination For Patiala And Sangrur LPU Hosts Mega Reunion: Thousands of LPU Alumni Relive Cherished Campus Memories CEO Maneesh Garg Releases Cycling T-Shirt containing message for voters Parth Jindal Net Worth [May 2024]: Know The Income of Delhi Capital Co-owner & Scion of JSW Group Gurjeet Singh Aujla took time out from the elections to meet the wrestlers Aam Aadmi Party got a big boost in Doaba, well-known Dalit leader and BSP candidate from Hoshiarpur Rakesh Soman joined the AAP Karan Kundrra has an amazing car collection. Let us know about Karan's car collection Armaan Malik reveals American singer Lauv’s role in his ‘Lauv Story’ with fiancée Aashna Shroff Mona Patel Net Worth 2024 | Unveiling the Net Worth of a Fashion Icon Is Aadhar Housing Finance IPO Worth Your Investment? Let’s Explore ME students from CGC Landran devise innovative Electric Wheelbarrow Clove Dental, India’s Largest Dental Chain opens 12 new Clinics in a single day to reach a milestone number of 500 Clinics in the Country President Droupadi Murmu given warm send off Synchrony Announces Rachana Bahadur as Senior Vice President, Country Head – India Cherished Moments: A Mother's Day Getaway at Fairmont Jaipur Mohnish Pabrai Net Worth (May 2024): Know The Wealth Of Indian-American Businessman We are working on the concept of 'Ek desh - Shresth desh'- Vij

 

50% Indian contribution in design of Kudankulam units 5-6

Listen to this article

Web Admin

Web Admin

5 Dariya News

Moscow , 04 Dec 2016

The Indian contribution to the design of units 5 and 6 of the Kudankulam Nuclear Power Project (KNPP) in Tamil Nadu will equal that of its Russian makers, a senior Russian official has said.According to Vladimir Angelov, director for projects in India, ASE Group (the engineering division of Rosatom), localisation at KNPP is aimed in three spheres: design, hardware equipment and transfer of know-how."From the viewpoint of the design work of the units 3 and 4, in comparison with units 1 and 2, the contribution of the Indian side in the design process is twice as high than for units 1 and 2. I can't say the exact percentage of the contribution, but this would be some 30-40 per cent in the design of the buildings and structures," Angelov told IANS here.For units 5 and 6, Russia envisages a spike in Indian contribution by an additional 10 per cent."We formulate the list of specifications of the requirements for the Indian side to find the suppliers; nevertheless, we have to coordinate. The Indian side should get the approval of the Russian side for the supply. As for units number 5 and 6, we are looking to increasing Indian contribution by an additional 10 per cent," he said."In accordance with our plans, it would be a 50:50 contribution for units 5 and 6," he added.

In terms of hardware equipment for units 3 and 4, India's contribution has also shot up. "In relation to the hardware equipment for units 3 and 4 in comparison with units 1 and 2 the contribution of the Indian side in the supply of the equipment has also grown. As far as units 3 and 4 are concerned, there are new experiences which both sides are gaining. For example, we are supplying some parts of the hardware which is designed by the Indian side. The buildings and structures will be designed by the Russian side, but the supplies will be made by the Indian side," Angelov said.Construction of Kudankulam NPP is the largest joint Russian-Indian project in the energy sector. The first two 1,000 MW units are currently operational at Kudankulam. Four more are in the pipeline.The Power Unit 1 of the Kudankulam NPP was connected to the grid on October 22, 2013, and began commercial production a year later. The second unit was connected to the grid on August 29, 2016.

India and Russia signed an inter-governmental agreement in December 2008 for Kudankulam's units 3 to 6. The ground-breaking ceremony for construction of units 3 and 4 was performed earlier this year.The third direction for localisation revolves around transformation of know-how of production experience to the Indian manufacturers."We are just taking the first steps in this direction. There are several items of the equipment of the reactor island (reactor installation itself) and we work in involvement of Russian manufacturers to transform the know-how of the production experience to the Indian manufacturers, including the supervision of such transformation. Up to now, the list of such equipment is not approved, but I can say for sure that they would be equipment of pretty high class of safety, up to the class of safety," he added.

 

Tags: Kudankulam n-plant

 

 

related news

 

 

 

Photo Gallery

 

 

Video Gallery

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2024 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD