Friday, 26 April 2024

 

 

LATEST NEWS Haryana Chief Secretary Reviews Heatwave Preparedness and Election Arrangements HPF&AS Trainee officers call on Governor Shiv Pratap Shukla Every Citizen's Vote: A beacon of hope for a better tomorrow - Chief Electoral Officer Anurag Agarwal Through C-Vigil, citizens are keeping a vigilant eye on the elections Renowned Bollywood Writer Javed Akhtar inspires Students at LPU's Media Fest "Xpressions-2024" IPL Player Tilak Varma Net Worth [April 2024] | 5 Dariya News 6 Top Priya Mishra Web Series To Watch [April- 2024] | 5 Dariya News Nehal Wadhera Net Worth 2024 (IPL Player) When the Congress government came, 50% reservation to women and MSP to farmers : Anuma Acharya AAP’s hard hitting attack on Channi: Post 1st June you will be arrested Manish Tiwari will win by a Huge margin: Jarnail Singh Amman is back with Romantic Track 'Dil Kare' Congress is working to divide the country in the name of religion and caste: Dr. Subhash Sharma PM Modi synonymous with trust, hope, credibility: Devender Singh Rana Atal Dulloo reviews the working & Public Outreach activities of Information Department General, Police Observer interact with Zonal, Sectoral Magistrates, BLOs of district Reasi Div Com Jammu, ADGP visit Rajouri, review preparations for elections Lt Governor addresses seminar on National Education Policy 2020 at Ghazipur DC Bandipora Shakeel ul Rehman Rather reviews Floriculture, Fisheries, Sericulture Departments DC Bandipora Shakeel ul Rehman Rather reviews performance of AHD DC Bandipora Shakeel ul Rehman Rather reviews Agriculture Sector

 

Railway nod for Rs 12,000-cr upgrade of mishap-prevention system

Listen to this article

Web Admin

Web Admin

5 Dariya News

New Delhi , 17 Dec 2017

The Indian Railways has cleared a Rs 12,000-crore proposal to equip electric locomotives with the latest European train protection system.At its meeting on December 15, the Railway Board cleared the proposal to equip 6,000 electric locos with European Train Control System (ETCS) Level-II to help drivers - or pilots -- to prevent rail mishaps, a senior Railway Ministry official told IANS.Besides, the Board also decided to install the ETCS Level-II system on the entire 9,054 km-long Golden Quadrilateral route connecting the four metros to make it a fully accident-free corridor.The entire project to ensure ETCS Level-II compliance is expected to cost around Rs 12,000 crore. There are cases where accidents occur due to error of locomotive pilots who generally have to work in very stressful conditions.Currently, the Railways has a basic automatic train protection system based on the ETCS Level-I specification to provide a back-up to loco pilots on a limited stretch.Known as a "train protection warning system", the facility based on ETCS Level-I has been implemented on about 342 km of rail route. Gatiman Express, running at 160 kmph between Nizamuddin and Agra, safely runs at this speed protected by the system.

However, it was decided to upgrade the system to put it on par with world standards as the ETCS Level-I has limitations.In a train protection warning system, information regarding the condition of the signals ahead -- whether it is showing red, yellow or green -- is communicated to the locomotive and is shown on a display screen called DMI (Driver Machine Interface) in the front of the loco pilot.In the ETCS Level-I system, this information regarding the condition of the signal ahead is periodically received in the loco whenever it passes over a device called "balise" which is fitted in the middle of the track at certain intervals.Thus this has a limitation that the information regarding the signal ahead is received only when a loco passes over a balise -- and the driver has to wait till he passes over the next balise to get updated information. This disadvantage of the ETCS Level-I is overcome in ETCS Level-II, which ensures that the status of the signal ahead is continuously available in the loco through a wireless radio medium using a GSM-R (Global System for Mobile Communication-Railways) network.GSM-R is similar to the mobile GSM network with some special features for Railway applications. With the status of the signal continuously available, the driver can now run the train more efficiently, as per the movement authority available to him, thereby improving overall speed and the section capacity of the route.With the implementation of ETCS Level-II, the balise fitted on the track for communicating the status of signals are no longer required.

 

Tags: KHAS KHABAR

 

 

related news

 

 

 

Photo Gallery

 

 

Video Gallery

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2024 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD