Thursday, 25 April 2024

 

 

LATEST NEWS 6 Top Priya Mishra Web Series To Watch [April- 2024] | 5 Dariya News Nehal Wadhera Net Worth 2024 (IPL Player) When the Congress government came, 50% reservation to women and MSP to farmers : Anuma Acharya AAP’s hard hitting attack on Channi: Post 1st June you will be arrested Manish Tiwari will win by a Huge margin: Jarnail Singh Amman is back with Romantic Track 'Dil Kare' Congress is working to divide the country in the name of religion and caste: Dr. Subhash Sharma PM Modi synonymous with trust, hope, credibility: Devender Singh Rana Atal Dulloo reviews the working & Public Outreach activities of Information Department General, Police Observer interact with Zonal, Sectoral Magistrates, BLOs of district Reasi Div Com Jammu, ADGP visit Rajouri, review preparations for elections Lt Governor addresses seminar on National Education Policy 2020 at Ghazipur DC Bandipora Shakeel ul Rehman Rather reviews Floriculture, Fisheries, Sericulture Departments DC Bandipora Shakeel ul Rehman Rather reviews performance of AHD DC Bandipora Shakeel ul Rehman Rather reviews Agriculture Sector DEO Bandipora Shakeel ul Rehman Rather inspects EVM, material strong room DEO Bandipora Shakeel ul Rehman Rather reviews poll preparedness Harnit Singh Sudan (IAS 2023) Interacts with IAS/JKAS Aspirants Marathon under SVEEP held at Samba to maximize voter awareness DEO Kupwara reviews transportation of polling staff, EVMs DEO Kulgam flags-off cycle rally under SVEEP to raise voter awareness

 

Hardeep S Puri lays Foundation Stone of Redevelopment of GPRA Colony at Sri niwas puri (Phase-I), New Delhi

Listen to this article

Web Admin

Web Admin

5 Dariya News

New Delhi , 22 Feb 2019

Hardeep S Puri,Minister of State (I/C), Housing and Urban affairs today laid the Foundation Stone of Redevelopment of GPRA Colony at Sriniwaspuri (Phase-I),  here in the august  presence of Ramesh Bidhuri, Member of Parliament (Lok Sabha) along with Shri Prabhakar Singh, Director General, CPWD.General Pool Residential Colony, Sriniwaspuri  at   present  is  having  total  1429  quarters  of different categories, out of which 820 quarters are being demolished in Phase-I. In this   residential   project,   CPWD   will   construct    4994  General   Pool  Residential Accommodation of different categories at a cost of Rs. 3999 crores in two phases. In the first phase, 560 Type-II, 1260 Type-III and 588 Type-IV  (total – 2408) dwelling units shall be constructed. Total 42 State of the Art towers with 19 to 26 Storyed structure  shall  be  constructed  at  a  cost  of  1100  crores,  which  shall   comprise  of basement, three  level  parking   and   social   infrastructure buildings including development works and services. The work shall be executed on EPC mode and shall  be completed by July 2021. Approx. 50% of the plot area would be developed as green area for enhancing the beauty and ecology of the premises.Keeping  in  view  the  focus   of  CPWD  on  eco-friendly  development,  CPWD  has carried out a critical review  of  the existing trees  in the premises and it has  been decided that not even a single tree shall  be cut and bare minimum trees which are coming in the alignment of building towers will be transplanted within the campus. CPWD has reduced the area of basement under the  Towers to avoid transplantation of  large  number  of  trees. In  addition  to  transplantation  of  trees,  compensatory planation of trees will be carried out in the complex in a big  manner.The   residential   complex   will   have   all   modern   amenities   including   Schools, Dispensary,  Shopping  complex  and  Community halls   etc. 

For  expeditious  construction,  new monolithic  construction  technology  shall  be  used  in  the  work.  Eco-friendly  green and energy efficient features shall be used so that  construction complies with the three  star  GRIHA  and  Silver  IGBC  Rating.  On  site  solar  power  units  shall  be installed on roof top with 800 KW capacity and power so  generated shall be used for common area services. The campus will have sewage treatment plant based on MBBR Technology which shall generate treated waste water of less  than 10 BOD and will be used for flushing purposes and horticulture. Surplus treated waste water will  be  supplied  to  adjoining  areas  for  greenery  and  shall  also  be   connected  to unfiltered  water  supply  line  which  will  increase  unfiltered  water  supply  in  other GPRA areas where there is shortage of unfiltered water.For Solid Waste  Management, Organic Waste Composters will be installed to treat solid waste. Rainwater Harvesting system will be provided to recharge the ground water.  Recycled  materials   made  from  C&D  waste  shall  be  used  in  the  works. Demolition of existing structures will be carried out in a systematic and controlled manner and area will be properly  barricaded with no disturbance to adjoining areas.The work shall be executed by the dedicated project team of CPWD Engineers and Architects under the leadership of Chief  Project Manager, Redevelopment Project Zone, and work shall be completed within scheduled target with the best quality standards. These flats once completed shall cater to  the requirement of providing most comfortable accommodation  to  the  Government  Employees  of  the  Central Government. This residential complex shall be a magnificent  blend of Architecture and Engineering.Shri Puri praised CPWD for their outstanding work and on time delivery of projects in recent past and desired that CPWD should complete  this work also in 23-24 Months.  Shri Prabhakar Singh assured that this work shall be completed in two years’ time.

 

Tags: Hardeep Singh Puri

 

 

related news

 

 

 

Photo Gallery

 

 

Video Gallery

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2024 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD