Saturday, 20 April 2024

 

 

LATEST NEWS Finally Wait is Over as Seductive Romantic Song 'Mann Kyun Behka Ja Raha Hai' Full Song is Released CGC Jhanjeri’s Fashion Show MERAKI 2024 goes in Style CEO Maneesh Garg briefs about Postal ballot facility for absentee voters Alumnus Sh. Ram Kumar Mittal, Founder & President of Swami International, USA, Inspires Students During Campus Visit to PEC In a first, CEO Sibin C holds Facebook live interaction with Punjab voters Top 9 Monalisa Hot Web Series To Watch In April 2024 | 5 Dariya News Drug awareness rally under NSS camp by RBU students Wheat planted using surface feeders at 40 places in barnala district : Punamdeep Kaur NSS PEC Organized Blood Donation Camp in Collaboration with PGIMER Biomed lab science day celebrated at RBU Singer Javed Ali recorded the song for Speed India Entertainment & HGV Anup Jalota, Udit Narayan, Babul Supriyo, and other singers received Dr. K.J. Yesudas Achievement Award Unique Initiative: Punjab's CEO Sibin C to go live on Facebook on April 19th Special monitoring of Social Media for Model Code of Conduct compliance - Chief Electoral Officer Anurag Agarwal In unique initiative, administration launches video helpline number 83605-83697 for speech and hearing-impaired voters Sakshi Sawhney directs procurement agencies to expedite wheat lifting Will make Punjabi the number one language in Chandigarh - Sanjay Tandon Vigilance Bureau nabs ASI for accepting Rs 4,500 bribe Magnificent Display of Indian Culture at LPU's annual 'One India-2024' Cultural Fest Suzuki Motorcycle India expands its footprint in Kerala Unlike Ravneet Bittu, Congress Has Always Respected Beant Singh Ji’s Legacy: Amarinder Singh Raja Warring

 

DDC reviews modalities for starting work on Sawalakote Hydel Power Project

Listen to this article

Rouf Pampori

Rouf Pampori

5 Dariya News

Ramban , 03 Jan 2017

To take review of pre-construction activities associated with Sawalakote Hydel Power Project, District Development Commissioner, Mohammad Aijaz, today convened a joint meeting of engineers and managers of construction companies. The meeting was attended by Chief Engineer Abdul Wahid, ADDC Ravinder Sadhu, Chief Planning Officer Uttam Singh, Collector Sawalkote Project Zameer Reshu, Design Director HCC Girish Mhaskar, Manager-Admin HCC Ajit Singh Parihar, Nodal Officer Vijay Nagri, Project Manager SP Singla Construction Manoharlal Arora, Senior Site Engineer Sandeep Singh and other officers. The meeting was informed that 1856 MW Sawalkote Hydel project shall involve a total of 1400 hectare of land including the submergence part from main site upto Ramban town and at present Rs.5.00 crore have been disbursed among the land owners for acquiring 226 kanal of land, while certain pre-construction activities have also been started.It was further informed that the major works under the project include double lane 1500 meter access tunnel, 174 meter long steel bridge to connect both banks of river Chenab, main road and realignment of some approach roads. The total height of the dam is expected to be 192 meter from the river bed.  

The tunnel shall be constructed by HCC and bridge by SP Singla construction.Chief Engineer informed the DDC that the design and structures have been proposed keeping in view their adaptability with the topography and seismic factors. For all aspects like forestation and soil conservation expert agencies shall be involved besides keeping the requisite funds for resettlement and rehabilitation of villagers to be affected during the construction work, he added. Threadbare discussion was held on issues of land acquisition, realignment of approach roads, rope way for transporting machinery, labourers and other equipment from left bank to right bank of the river. Stressing the importance of the ambitious project, DDC instructed the officers and engineers for conducting joint inspections to remove bottlenecks associated with the acquisition of land for the project keeping in view the priorities of the works. He directed the Collector Land Acquisition for early completion of all pending land acquisition cases to expedite the work. He further assured that periodical meetings shall be conducted for reviewing the time bound progress of different works associated with mega hydel project.

 

Tags: DDC Ramban

 

 

related news

 

 

 

Photo Gallery

 

 

Video Gallery

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2024 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD