Friday, 26 April 2024

 

 

 

Inadequate funds halt work on Hyanpalpora bridge: Abdul Haq Khan

Listen to this article

Rouf Pampori

Rouf Pampori

5 Dariya News

Srinagar , 08 Jun 2016

Minister for Rural Development and Panchayti Raj, Mr Abdul Haq informed the house that repair work of Hyanpalpora Bridge wasn’t taken up due to inadequate funds as the estimates were framed up for an amount of Rs 21.68 lakh.Replying to a question read by Shiekh Ishfaq Jabbar on behalf of Mian Altaf Ahmad, the Minister said that the bridge would be taken up for repairs when adequate funds are available under CDF in convergence mode.Responding to the supplementary of the member, the Minister clarified that in the first instance, the DPR for repair work of the bridge was formulated for Rs 21.68 lakh by the concerned engineers but the Engineers while surveying the bridge suggested for construction of new bridge at the site and thus formulated a new DPRs of Rs 53 lakh which was a big amount for the department to execute. He said that the Department is however considering arranging funds for construction of the bridge.

 

Tags: Abdul Haq Khan

 

 

related news

 

 

 

Photo Gallery

 

 

Video Gallery

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2024 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD